Today we prepared the last pieces of horizontal and vertical steel and set them in place. We also covered the tops of the East and West walls with strapping to prevent any concrete from spilling on to the ICF dimples. At 8:30am Reis Trucking arrived with a redi-mix truck and a pump truck, and we poured the first story walls.
Great job!
Monday, September 29, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment